Habitat


Property Details

Address: M.R Radha Garden Road, Pudupakkam
City:
Area:
State/County:
Country: India
Property Id : 19479
No. Of Blocks: 4
Type Of Flats: 2 BHK & 3 BHK
No. Of Floors: Stilt + 9 Floors
No Of Flats: 212 2 Bedroom + 2 Toilets : 80 Units 3 Bedroom + 2 Toilets : 64 Units 3 Bedroom + 3 Toilets : 68 Units
Apartment Range: 2 BHKs + 2 Toilets : 1244, 1425 & 1482 Sq ft 3 BHKs + 2 Toilets: 1487, 1547, 1584, 1591 & 1640 Sq ft 3 BHKs + 3 Toilets : 1737 Sq ft
Car Parking: Stilt
Expected Delivery: Ready to Move-in.

Features

Video door phone
Clubhouse
Water Softening Plant
Children’s Play Area
Swimming pool
Fire Alarm & Wet Riser system
Sewage treatment plant
500 watts standby power supply for EWS Block
Toilets for Drivers/ Domestic help
Landscaped garden with water bodies
100% back-up power for common areas
Lifts with V-3F & ARD
Fitness Centre (A/c)
Indoors Games (A/c)
Party Hall (A/c)
Access controlled doors with CCTV cameras coverage @ vantage points
Wi-Fi connectivity in Clubhouse
Provision for AC Outdoor unit placement
Core cutting / AC water drainage

Current status

  • Elevation facing main road

  • Swimming pool - Final Stage

  • Swimming pool - Final Stage

  • All blocks - Pre-handover stage.

  • All blocks - Pre-handover stage.

  • Banquet hall - Final Stage

  • Banquet hall - Final Stage

  • All Blocks - Back Side view

  • Solar Panels Fixed on Terrace.

Block -A

  • UPVC  work completed.
  • Electrical work Completed.
  • Main Door Fixing  completed.
  • Wall putty and primer completed.
  • Tiles work Completed .
  • Lift Installation work completed testing in progress.
  • Fire Shaft Work  & Testing completed.
  • Snag and Pre Final work is in progress.

Block – B

  • UPVC Window Installation & grill work Completed
  • Stair case laying completed.
  • Lobby Granite laying work Completed.
  • kitchen granite work Completed.
  • Tiles work Completed for flats.
  • Electrical work completed for 15 flats.
  • Door Fixing completed up to 3floors.
  • Wall putty and primer finished for 52 flats.
  • UPVC door Installation completed.
  • Lift Installation work completed testing under progress.
  • Snag and Pre-Final work is in progress.

Block – C

  • Internal & External Plastering Completed.
  • UPVC  Window Installation & grill work  Completed.
  • Stair case & kitchen granite work completed.
  • Lobby work completed.
  • Tiles work  completed.
  • Electrical work  is in progress.
  • Door Fixing completed up to 9th  floor.
  • Wall Putty up to 9th floor completed 9th floor onwards progress.
  • Lift Installation work completed trail yet to complete.
  • C Block plumbing  internal  completed.
  • plumbing  Shaft  area work completed.
  • Snag and Pre-final work is in progress.

Block – D

  • Internal & External Plastering Completed.
  • UPVC  Window Installation completed & grill work   completed.
  • Lobby work in progress.
  • Staircase shah bath work completed.
  • kitchen granite completed.
  • Tiles work is in progress 1st  6th  5th 7th 8th &9th floors flats   completed.2nd  3rd  & 4th floor is in progress.
  • Electrical work, Door Fixing and Wall putty yet to start.
  • Lift Installation work completed trail yet to complete.
  • D Block plumbing  internal  completed.
  • plumbing  Shaft  area work completed.
  • Snag and Pre-Final Work is in progress.

 

COMMON AREA WORK DETAILS.

  • External painting A and B Block  C Block Completed  and D Block is in  progress.
  • Security Room Completed.
  • Compound wall work completed around 95% and grill is yet to fixed.
  • Paver  Block work Progress in A Block Stilt Floor & western side.
  • STP work is in Completed.
  • Pump room work Completed.
  • Swimming pool tile and Granite work is in progress.
  • Common Area Electrical and drainage Chamber work completed.
  • Panel Board Electrical work completed.
  • Common area Leveling work under progress.

Club House

  • Tiling and granite work in flooring and stair case completed.
  • AC Copper line work completed & drain line checking in progress.
  • False Ceiling frame fixing work under progress.
  • Wall Punning is in progress.
  • Gym flooring is in progress.
  • Stair case Hand Rail fixing completed.
  • Electrical wiring completed.

Super Market

  • Pile Foundation work in progress.

FAQ

We have attempted to provide answers to the queries in the sequence of order normally asked by the customers. However, if you have any other queries, please visit our office.

1) Where is Habit@t located?

It is located right behind the Siruseri SIPCOT IT Park.

2) Can you share some of the details about Habit@t?

Habit@t is set amidst 40 Grounds – A land area of 10,750 sq ft has been earmarked for open space reservation.

This development will have 212 apartments in four blocks consisting of 2 BHKs & 3 BHKs.

The areas start from 1244 sq.ft. to 1737 sq ft.

3) What is the Approval status?

All approvals obtained.

4) What is the current status?

Ready to Move-in.

5) What is the payment schedule?

10% of the overall base flat cost as advance at the time of booking.
Further payment schedule can be collected from our Sales Team.

6) What do you mean by Customization?

Customization in general covers lofts, extra switch points, grills in balcony & for main entrance and is strictly guided by feasibility. These requests can be accommodated, depending upon the feasibility and entail additional costs, on the basis of cost estimates agreed and payment made in advance.

The customization requirements will be facilitated by our Customer Care Team.

7) When can I approach your Customer Care team to make changes within the apartment?

The request for changes/ customization will be considered either at the time of signing the construction agreement or when the 30% payment stage is completed or at the beginning of the particular activity, whichever is appropriate.

Customer Care team will send an invite for customization with soft copies of electrical and civil drawings by mail outlining the feasibility of each customization including the ‘not-so-feasible’ works like bathrooms / waterlines, in particular, which cannot be changed or altered.

8) What type of kitchen is provided?

Kitchen will have granite top with stainless steel sink.

9) Will Lofts be provided?

Bedrooms will have lofts.

Our offering does not include the wardrobes and anyone intending to have wardrobes may approach a specialist for the same.

10) What are the other costs?

Car park, registration charges, corpus fund, maintenance, statutory deposits, DTH Multi-system, Reticulated Gas deposit, etc.,

11) Which Banks have approved this project?

All leading banks have approved this project.

12) How is water quality?

“Water Softening Plant” is provided as part of our offering.

Water softening aids in the removal of calcium, magnesium, and certain other metals in hard water. The resulting soft water is more compatible with soap and extends the lifetime of plumbing.

13) Is there any provision for Back-up power?

Yes. Elevators/motor pumps, common areas will have 100% back-up while each apartment will have 500 watts back-up.

14) I am an NRI. Can I book from abroad?

Yes. You can book from anywhere in the world. Just send your complete details by email.

15) How can I transfer funds to your account?

You can wire-transfer funds from anywhere in India or from abroad using RTGS mode. Just send a mail to us at arel@vsnl.net to get our account number/ bank/branch and Swift codes.